You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Outside Ladbrokes 6-10 High St. Dunstable LU6 3HA

Reported via desktop in the Drains/Ditches Blocked category anonymously at 17:00, Wednesday 13 March 2024

Sent to Central Bedfordshire Council less than a minute later. Council ref: 403800.

We are the maintenance team for ladbrokes and have attended the shop and carried out the following - Attended to further investigate and attempt to gain access to pipework at ground level. Removed false wall to entrance to find pipe does not discharge through this space. Decision then made to trace from within store. Trimmed facia and knocked out some decorative brick to find RWP runs within the internal wall of the store. Followed this to floor, removing skirting exposing brickwork. Knocked through this to expose bend of pipe heading to road. This would appear not to be trapped within. The issue has been traced to outside of the shop within the highways area. Can you please investigate this - if you require a visit with our drainage/plumbing contractor, please let me know an eta and I can arrange.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • State changed to: Investigating

    Updated by Central Bedfordshire Council at 17:00, Wednesday 13 March 2024

  • Thank you for your Highways report.
    An order has now been raised to rectify the identified issue and this will now be added to our programme of works. We are, unfortunately, unable to provide you with a timescale for this work to be completed, however, all repairs are prioritised using an assessment matrix in line with our Network Maintenance Management Plan (NMMP)

    We will continue to monitor all defects to ensure the safety of our residents as part of the NMMP which can be found online - http://www.centralbedfordshire.gov.uk/ transport/ roads-strategies/ highways-asset-management.aspx

    Many thanks,
    Central Bedfordshire Council Highways

    State changed to: Action scheduled

    Posted by Central Bedfordshire Council at 13:49, Monday 9 September 2024

  • Thank you for submitting your Highways report.
    Our engineers have inspected the area and are satisfied that no further action is required at this time. If the issue becomes worse, please do contact us again.
    An order has been completed at this location.
    Many thanks,
    Central Bedfordshire Council Highways

    State changed to: No further action

    Posted by Central Bedfordshire Council at 15:08, Monday 14 October 2024

This report is now closed to updates from the public. You can make a new report in the same location.