You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Boundary Wall of Number 9 Brookbanks SG18 0QF

Reported via desktop in the Public Rights of way category anonymously at 08:07, Tuesday 1 October 2024

Sent to Central Bedfordshire Council less than a minute later. FixMyStreet ref: 6536143.

Ringway Jacobs (Central Bedfordshire Council) footpath improvement works to FP12 adjacent to Brookbanks, contractors have removed spoil for the improvement of the surface and have piles material against property boundary wall. This now means that verge is higher than the DPC of the boundary wall and needs to be removed before damage is caused to the boundary wall. Material needs to be removed and original level reinstated so that water is not trapped against wall and DPC is effective, at present there is non-permissible interference of property by CBC contractor.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • Excess soil material has now been removed

    State changed to: Closed

    Posted by Central Bedfordshire Council at 13:25, Tuesday 1 October 2024

This report is now closed to updates from the public. You can make a new report in the same location.